fieldid
เขตข้อมูล | ข้อมูล |
บทคัดย่อ |
A STUDY OF PROCUREMENT EVALUATION A CASE STUDY OF PHARMACEUTICAL COMPANY : The objective of this study is to find the materials ordering method, which provides low risk of materials shortage, optimum inventory level, less complication logic with minimize level of human intervention in the ERP system. The case study company has already started ERP implementation but the full function of production module has not been obtained. The actual production scheduling was performed outside the system. The evaluation was conducted on important export product groups. Six-month period was selected to simulate based on customer ordering plan of year 2014. The four material ordering patterns were selected for evaluation. The first method: Advance arrival of materials before shipment date 90 days The second method: Advance arrival of materials before shipment date 60 days and grouped safety stock of level 1 and level 2 components for each packing style The third method: Advance arrival of materials before shipment date 60 days and safety stock of level 2 for each group and safety stock of level 1 for each packing style The fourth method: Arrival of material at the 1st day of actual production month and safety stock of level 2 for each group and safety stock of level 1 for each packing style The study found that no shortage of raw materials in the 2nd and the 4th method, but the 1st method and the 3rd method were found shortage. The averages of six-month inventory values of the 1st method to the 4th method were 13,090,000 Baht, 34663,333 Baht, 20,056,667 Baht, and 2
|
ผู้แต่ง |
|
ประเภทสิ่งพิมพ์ |
|
ปีที่พิมพ์ |
1 |
เลขหน้า |
65 |
หัวเรื่อง |
|
หัวเรื่อง |
|
เอกสารฉบับเต็ม |
Center of Academic Resource
Institute of Technology 1771/1, E Building, Fl. 2,
Pattanakarn Rd, Suan Luang, Bangkok, 10250