fieldid
เขตข้อมูล | ข้อมูล |
บทคัดย่อ |
A STUDY OF PROCUREMENT EVALUATION A CASE STUDY OF PHARMACEUTICAL COMPANY : The objective of this study is to find the materials ordering
method, which provides low risk of materials shortage, optimum
inventory level, less complication logic with minimize level of human
intervention in the ERP system. The case study company has already
started ERP implementation but the full function of production module
has not been obtained. The actual production scheduling was
performed outside the system. The evaluation was conducted on
important export product groups. Six-month period was selected to
simulate based on customer ordering plan of year 2014. The four
material ordering patterns were selected for evaluation. The study
found that no shortage of raw materials in the 2nd and the 4th method,
but the 1st method and the 3rd method were found shortage. The
averages of six-month inventory values of the 1st method to the 4th
method were 13,090,000 Baht, 34663,333 Baht, 20,056,667 Baht, and
23,220,000 Baht, respectively. The most preferable method was the
4th method. The actual production scheduling was an important tool
for material ordering. A safety stock has an important role to prevent
the shortage of materials. However safety stock should be carefully
monitored to control the level of inventory. For further study, the
unstable of demand and supply should be considered.
Keywords : Enterprise Resources Planning (ERP), Optimum Inventory,
Safety Stock.
|
ผู้แต่ง |
|
ประเภทสิ่งพิมพ์ |
|
ปีที่พิมพ์ |
1 |
เลขหน้า |
5 |
หัวเรื่อง |
|
เอกสารฉบับเต็ม |
Center of Academic Resource
Institute of Technology 1771/1, E Building, Fl. 2,
Pattanakarn Rd, Suan Luang, Bangkok, 10250